Hotline: 0906702060
|
Email: tuyen.dinh@vitrac.vn
Language
Tiếng Anh
Tiếng Việt
0
Your shopping cart is empty!
Menu
Home
Products
HAMM ROLLER
Hamm Compactor
Tandem Roller
Pneumatic tyre roller
Hitachi Wheel Loader
Hitachi Excavator
Crawler Excavator
Wheel Excavator
Attachments for Excavator
Everdigm Concrete Pump
Concrete Boom Pump
Concrete Self-propelled pump
Concrete Trailer Pump
Paver
Tracked Paver
Wheeled Paver
PowerFeeder
Screed
Crane
Other Construction machines
Used Machines
Parts
Service
News
Tổng hợp
Chương trình đào tạo
Bàn giao máy
Thông tin dự án - Doanh nghiệp
Technology
Wirtgen
Hamm
Vogele
Hitachi
Everdigm
Tadano
Kleemann
Benninghoven
Tổng hợp
Contact
Home
Products
HAMM ROLLER
Hamm Compactor
Tandem Roller
Pneumatic tyre roller
Hitachi Wheel Loader
Hitachi Excavator
Crawler Excavator
Wheel Excavator
Attachments for Excavator
Everdigm Concrete Pump
Concrete Boom Pump
Concrete Self-propelled pump
Concrete Trailer Pump
Paver
Tracked Paver
Wheeled Paver
PowerFeeder
Screed
Crane
Other Construction machines
Used Machines
Parts
Service
News
Tổng hợp
Chương trình đào tạo
Bàn giao máy
Thông tin dự án - Doanh nghiệp
Technology
Wirtgen
Hamm
Vogele
Hitachi
Everdigm
Tadano
Kleemann
Benninghoven
Tổng hợp
Contact
Biện pháp thi công mặt đường be tông nhựa
Home
Product Compare (0)
Sort By:
Rating (Highest)
Default
Name (A - Z)
Name (Z - A)
Price (Low > High)
Price (High > Low)
Rating (Highest)
Rating (Lowest)
Model (A - Z)
Model (Z - A)
Show::
12
12
24
36
48
60
120
DL420CVT-5
Liên hệ
DL420CVT-5
Model
DL420CVT-5
Loại
Bánh lốp
Trọng lượng vận hành
22 930 kg
Dung tích gầu
4.2 m3
Công suất động cơ
345 HP
Thương hiệu
Doosan
Xuất xứ
Hàn Quốc
Địa điểm
Hà Nội, Đà Nẵng, Đồng Nai
DL420CVT-5
Liên hệ
Model
DL420CVT-5
Loại
Bánh lốp
Trọng lượng vận hành
22 930 kg
Dung tích gầu
4.2 m3
Công suất động cơ
345 HP
Thương hiệu
Doosan
Xuất xứ
Hàn Quốc
Địa điểm
Hà Nội, Đà Nẵng, Đồng Nai
Showing 0 to 0 of 0 (0 Pages)