Hotline: 0906702060
|
Email: tuyen.dinh@vitrac.vn
Language
Tiếng Anh
Tiếng Việt
0
Your shopping cart is empty!
Menu
Home
Products
HAMM ROLLER
Hamm Compactor
Tandem Roller
Pneumatic tyre roller
Hitachi Wheel Loader
Hitachi Excavator
Crawler Excavator
Wheel Excavator
Attachments for Excavator
Everdigm Concrete Pump
Concrete Boom Pump
Concrete Self-propelled pump
Concrete Trailer Pump
Paver
Tracked Paver
Wheeled Paver
PowerFeeder
Screed
Crane
Other Construction machines
Used Machines
Parts
Service
News
Tổng hợp
Chương trình đào tạo
Bàn giao máy
Thông tin dự án - Doanh nghiệp
Technology
Wirtgen
Hamm
Vogele
Hitachi
Everdigm
Tadano
Kleemann
Benninghoven
Tổng hợp
Contact
Home
Products
HAMM ROLLER
Hamm Compactor
Tandem Roller
Pneumatic tyre roller
Hitachi Wheel Loader
Hitachi Excavator
Crawler Excavator
Wheel Excavator
Attachments for Excavator
Everdigm Concrete Pump
Concrete Boom Pump
Concrete Self-propelled pump
Concrete Trailer Pump
Paver
Tracked Paver
Wheeled Paver
PowerFeeder
Screed
Crane
Other Construction machines
Used Machines
Parts
Service
News
Tổng hợp
Chương trình đào tạo
Bàn giao máy
Thông tin dự án - Doanh nghiệp
Technology
Wirtgen
Hamm
Vogele
Hitachi
Everdigm
Tadano
Kleemann
Benninghoven
Tổng hợp
Contact
Biện pháp thi công mặt đường be tông nhựa
Home
Product Compare (0)
Sort By:
Rating (Highest)
Default
Name (A - Z)
Name (Z - A)
Price (Low > High)
Price (High > Low)
Rating (Highest)
Rating (Lowest)
Model (A - Z)
Model (Z - A)
Show::
1000
12
24
36
48
60
120
S1900-3
Contact
S1900-3
Model
S1900-3
Type
Tracked Paver
Engine
Cummins, QSB6.7-C203, 151 kW
Screed
AB 500, AB 600, SB 300, SB 300 HD
Pave width
11 m
Maximum laydown rate
900 t/h
Brand
Vogele
Country of Manufacture
Germany
Location
Viet Nam
Contact
0906 702 060 (Mr Tuyen)
S1900-3
Contact
Model
S1900-3
Type
Tracked Paver
Engine
Cummins, QSB6.7-C203, 151 kW
Screed
AB 500, AB 600, SB 300, SB 300 HD
Pave width
11 m
Maximum laydown rate
900 t/h
Brand
Vogele
Country of Manufacture
Germany
Location
Viet Nam
Contact
0906 702 060 (Mr Tuyen)
Showing 0 to 0 of 0 (0 Pages)