Hotline: 0906702060
|
Email: tuyen.dinh@vitrac.vn
Language
Tiếng Anh
Tiếng Việt
0
Your shopping cart is empty!
Menu
Home
Products
HAMM ROLLER
Hamm Compactor
Tandem Roller
Pneumatic tyre roller
Hitachi Wheel Loader
Hitachi Excavator
Crawler Excavator
Wheel Excavator
Attachments for Excavator
Everdigm Concrete Pump
Concrete Boom Pump
Concrete Self-propelled pump
Concrete Trailer Pump
Paver
Tracked Paver
Wheeled Paver
PowerFeeder
Screed
Crane
Other Construction machines
Used Machines
Parts
Service
News
Tổng hợp
Chương trình đào tạo
Bàn giao máy
Thông tin dự án - Doanh nghiệp
Technology
Wirtgen
Hamm
Vogele
Hitachi
Everdigm
Tadano
Kleemann
Benninghoven
Tổng hợp
Contact
Home
Products
HAMM ROLLER
Hamm Compactor
Tandem Roller
Pneumatic tyre roller
Hitachi Wheel Loader
Hitachi Excavator
Crawler Excavator
Wheel Excavator
Attachments for Excavator
Everdigm Concrete Pump
Concrete Boom Pump
Concrete Self-propelled pump
Concrete Trailer Pump
Paver
Tracked Paver
Wheeled Paver
PowerFeeder
Screed
Crane
Other Construction machines
Used Machines
Parts
Service
News
Tổng hợp
Chương trình đào tạo
Bàn giao máy
Thông tin dự án - Doanh nghiệp
Technology
Wirtgen
Hamm
Vogele
Hitachi
Everdigm
Tadano
Kleemann
Benninghoven
Tổng hợp
Contact
Biện pháp thi công mặt đường be tông nhựa
Home
Product Compare (0)
Sort By:
Default
Default
Name (A - Z)
Name (Z - A)
Price (Low > High)
Price (High > Low)
Rating (Highest)
Rating (Lowest)
Model (A - Z)
Model (Z - A)
Show::
120
12
24
36
48
60
120
PC130-8
Liên hệ
PC130-8
Model
PC130-8
Loại
Bánh xích
Trọng lượng vận hành
12 380 - 12 740 kg
Dung tích gầu
0.18 - 0.60 m3
Công suất động cơ
68.4 / 2 200 kW/rpm
Thương hiệu
Komatsu
Xuất xứ
Nhật Bản
Địa điểm
Hà Nội, Đà Nẵng, Đồng Nai
PC130-8
Liên hệ
Model
PC130-8
Loại
Bánh xích
Trọng lượng vận hành
12 380 - 12 740 kg
Dung tích gầu
0.18 - 0.60 m3
Công suất động cơ
68.4 / 2 200 kW/rpm
Thương hiệu
Komatsu
Xuất xứ
Nhật Bản
Địa điểm
Hà Nội, Đà Nẵng, Đồng Nai
Showing 0 to 0 of 0 (0 Pages)